摘要
江垭大坝位于湖南省慈利县江垭镇。在施工中成功地伙用了深槽皮带和负压溜槽运输混凝土,并创造了碾压混凝土斜层铺筑施工方法获得成功。
[Abstract] The Jiangya dam is located in Chili county of Hunan province. In constructing, the concrete were successfully transported by the deep trough belt and the negative pressure slide trough conveyor. And a bevel spread construction method was used in the roller compacted concrete construction.
出处
《东北水利水电》
2002年第5期28-29,共2页
Water Resources & Hydropower of Northeast China