白石水库在坝基开挖中揭露出的地质情况与原设计有一定差距且断层较多,故在整个坝基开挖中采取主要处理断层及对强风化岩局部处理的方法,达到了预期的目的,并对工程地质问题处理作了反思。
[Abstract] The geologic formation revealed by excavation of the dam foundation in Baishi reservoir differs from the original design. The emphasis is to dispose the faults and the local intense weathering in constructing. The paper reviews the disposition of engineering geologic that has obtained the expectant purpose.