摘要 太平湖水库位于嫩江一级支流黄蒿沟上 ,控制面积 6 83km2 ,设计标准为 10 0年一遇 ,2 0 0 0年一遇校核 ,工程等别为大Ⅱ型 ,设计总库容 1 5 3亿m3 。 1999年 12月被鉴定为三类病险库 ,对于所暴露出的左坝肩绕渗现象采用帷幕灌浆处理 ,通过合理的设计和精心施工 ,地质条件得到了明显改善 ,侧渗现象消失 ,较好的达到预期目的 。 The peace lake reservoir is located in the Huanggao channel of the Nen River's first rank branch. It's controls area 683 km 2, design standards for one hundred years and revise standards for two thousand, engineering grade on large two scale, the designing reservoir hold is 1.53 hundred million stere. It was indetified the third level disease and danger reservoir in December 1999. For the emerging left shoulder dam circle seeping phenomena, we adopted purdah grouting disposing, geologic condition was maked patency ameliorate, circle seeping phenomenon died away, and achieved anticipate aim as well as outstanding effect.
出处 《水利科技与经济》 2002年第2期70-71,共2页 Water Conservancy Science and Technology and Economy
关键词 帷幕灌浆工程 坝肩 检查孔 透水率 purdah grouting designing checking hole the rate of penetrating water
  • 相关文献

参考文献1

  • 1李茂芳 孙钊.大坝基础灌浆[M].北京:水利电力出版社,1987..

共引文献14

同被引文献3

  • 1李涛,郝学军.西山湾水利枢纽左坝肩帷幕灌浆设计与施工[C] //2004水利水电地基与基础工程技术-中国水利学会地基与基础工程专业委员会2004年学术会议论文集.北京:中国水利学会,2004.
  • 2李涛,郝学军.西山湾水利枢纽左坝肩帷幕灌浆设计与施工[c]//中国水利学会地基与基础工业专业委员会.2004年学术会议论文集:2004水利水电地基与基础工程技术.北京:中国水利学会地基与基础工业专业委员会,2004:90-91.
  • 3张本华.关河水库除险加固设计[J].山西水利,2008,24(4):54-55. 被引量:2

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部