摘要
介绍了昆明盐矿输卤管线发生移位造成的原因,并对复杂地形输卤管的计算、校核,发现设计存在的不足,通过改造后取得了很好的效果。
This paper introduced the cause of brine transfer pipe taking place shift and discovered the problem in design through calculating and checking pipe line in the complex landform and at last it advanced all right effect after alteration.
出处
《中国井矿盐》
CAS
北大核心
2002年第3期26-28,共3页
China Well and Rock Salt