摘要
根据海河口现场实测资料和数学模型试验 ,并结合天津港总体发展规划 ,进一步分析了不同治导线方案 。
In accordance with the site-surveyed data of Haihe Estuary and mathematical model test,and in combination with the overall development plan of Tianjin Port, different schemes for river training line are further analyzed and the recommended scheme for the rational reclamation scale of Nanjiang Harbor District is presented.
出处
《水运工程》
北大核心
2002年第5期19-23,共5页
Port & Waterway Engineering
关键词
天津港
南疆港区
造陆规范
治导线
泄洪能力
港口总体规划
Nanjiang Harbor District
reclamation scale
river training line
flood-carrying capacity