摘要
桥面大修工程在铁路局每年的大修计划中占有相当比例。笔者通过对2000年施工的部分桥面大修工程进行现场调查,并结合近几年在既有线施工中遇到的一些新情况及新问题,以及对桥面大修工程亏损原因做了认真分析,仔细测算了人工、村料的实际消耗量,提出了解决问题的一些想法和建议。
The bridge floor capital repair work takes a considerable portion in the annual capital repair plan of railway administrations . Based on the field investigation into part of the bridge floor capital repair carried out in 2000 and combined with the new situation and new problems encountered in the construction of existing railway lines over the recent past years, the author makes an earnest analysis of the loss incurred in the capital repair, carefully calculates the actual consumption of labour & materials before presenting some ideas of and proposal for the solution to those problems.
出处
《铁路工程造价管理》
2002年第3期26-28,5,共3页
Railway Engineering Cost Management