摘要
本文提出了一种新的网络计划技术的数学模型——工程进度分析模型PSAM,给网络计划技术的分析思想和基本概念赋予了新的含义,沟通了施工作业计划和网络进度计划的联系,并有利于电子计算机在工程进度控制中的应用。
A new mathematical model of network program technique, project schedule analytical model (PSAM), is developed in this paper. New implications are entrusted to the basic concept and methodology of network program technigue. This model builds up the interconnection between working program and network schedule, and is helpful to computer application in project schedule control
关键词
施工
进度
网络法
计划模型
engineering construction
network method
planning model