摘要
文章从合理配置华北水资源的角度 ,通过对我国南水北调目前几个方案的对比分析 ,提出解决我国华北缺水问题的跨流域调水方案的优化设想及其便捷的路线 :从黄河沿偏关河调水至永定河上游 ,再以海河水系分流供应华北 ,然后从长江补水进黄河 ;实现以北方的水资源供应华北 ,以南方的水资源作补偿和使黄河成为“H”状的永不断流的清水河的目标。从水文特征、工程特征、生态与风险、社会与经济效益等多个方面对优化方案进行了综合分析 。
It is suggested in this paper that China's south-to-north water transfer could be put into practice by a new plan, whose route designed is like “H” in shape. The new plan argues that the Yellow River water should be transferred from Pianguan River, in the north of Shangxi Province to the headwater of Yongding River, which makes it possible to supply regions within the North China Plain with water respectively. Meanwhile, the water of Danjiangkou Reservoir can be transferred directly to Yellow River, replenishing the water shortage of Zhengzhou or Sanmenxia Reservoir. It is suggested in this paper that more benefits, in fields such as ecological and environmental protections, calamity prevention, cultivated land saving and so on, can be got from this new plan's implementation.
出处
《资源科学》
CSSCI
CSCD
北大核心
2002年第3期8-13,共6页
Resources Science
基金
广东省社科十五重大委托课题子项目"珠三角现代城乡一体化模式与格局研究"(编号 :0 1T0 1-3-1)资助
关键词
跨流域调水
南水北调
华北
水资源
合理配置
中国
Cross-basin water transfer
South-to-North water transfer project
Northern China
Water resources
Rational distribution
Optimize