介绍了和顺变电站 110kV母线发生空载谐振过电压的故障及处理过程 ,在对其进行分析的基础上 ,提出了避免谐振过电压应采取的措施。
The syntonic overvoltage occured with 110kV bus in Heshun substation is introduced. The cause is analysed and the preventive measures to solve the problem is proposed.