期刊文献+

作业调度问题的合作求解方法研究 被引量:1

A study on cooperation-solving approach to solving the job-scheduling problem
下载PDF
导出
摘要 作业调度问题是一类典型的困难组合优化问题 ,基于知识的多智能主体系统为解决此类问题提供了一种新的思路 .在生产作业管理中引入多智能主体技术 ,可以很方便地用智能主体及多智能主体系统描述制造系统及其组成要素的行为与运行机制 ,作业调度通过智能主体之间及多智能主体系统的合作加以实现 ,达到预定的运行目标和状态 .构造了单个智能主体的结构 ,对作业调度问题中存在的三种主要冲突类型与基于知识的协商消除冲突的方法及其步骤进行了探讨 . The job scheduling problem (JSP) is a typically hard nonpolynomial problem (NP hard), and the multi agent system (MAS) based on knowledge is a new solution to JSP. The behavior and operating mechanism of the units of manufacturing system would be conveniently described and simulated by using agent and MAS. The job scheduling would be accomplished by agent cooperating with each other and the cooperation of MAS , and the due operating goals and status would be achieved. The framework of the single agent is constructed. The three kinds of conflicts existing in JSP are discussed and the negotiation approach and process are studied based on knowledge to remove conflicts. The Multi agent Cooperation Solving Approach (MCSA) based on knowledge is created.
出处 《华中科技大学学报(自然科学版)》 EI CAS CSCD 北大核心 2002年第5期44-46,共3页 Journal of Huazhong University of Science and Technology(Natural Science Edition)
基金 教育部高等学校博士学科点专项科研基金资助项目 (980 4 8730 )
关键词 作业调度问题 多智能主体系统 合作求解 协商 job scheduling problem (JSP) multi agent system (MAS) cooperation solving negotiation
  • 相关文献

参考文献3

  • 1Roadammer F A, White K P. A recent survey of production scheduling. IEEE Trans. on SMC. 1998,18:841-851
  • 2熊锐,吴澄.车间生产调度问题的技术现状与发展趋势[J].清华大学学报(自然科学版),1998,38(10):55-60. 被引量:92
  • 3Rabclo R J, Camamha-Matos L M, Afsarmancsh H.Multi-agent-based agile .scheduling. Robotics and Autonomous Systems, 1999, 27:15-28

二级参考文献11

共引文献91

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部