摘要
以新疆独山子石化总厂乙烯厂 4 0 0m3氢气球罐整体搬迁为例 ,探讨了大型设备整体搬迁技术及施工过程中应注意的问题 ,介绍了此类施工的经验 。
It is difficult to move large equipment entirely because of their enormous volume, weight and high barycenter.The entire moving techniques of the 400 m 3 hydrogen spherical tank of Xinjiang Dushanzi Oil Refinery Plant are introduced.It is a good case to other enterprise.
出处
《石油化工设备》
CAS
2002年第1期44-45,共2页
Petro-Chemical Equipment