摘要
本文从水工水力学的角度出发,对建国以来、特别是近些年来我国在高坝枢纽布置和泄洪消能技术方面所取得的成功经验和创造性的进展作一简评,以期为今后的工程建设和科学研究提供参考和借鉴。
Depending on hydraulic engineering and hydraulics some successful experience and new advances on the layout of hydro-junction and technique of flood discharge and energy dissipation in China in recent years have been remarked in order to afford a reference for projects construction and scientific research in future. This paper was separated four parts: 1. The developmental situations and special points for high dams construction in China; 2. Optimized layout of hydro-junction; 3. Energy dissipation and erosion control of flood discharge structures; 4. The application and development of several new types of energy dissipators.
出处
《西北水资源与水工程》
1991年第2期1-15,共15页
Northwest Water Resources & Water Engineering