摘要 以正在建设中的上海市轨道交通明珠线二期工程上、下行线近距离交叠区间隧道盾构施工为研究对象 ,按“先下后上”的盾构推进过程 ,采用三维弹塑性有限元法ANSYS程序软件模拟了交叠隧道土层位移以及地表沉降曲面在盾构推进中的发展变化 ,得出了地面最大沉降量在上行隧道推进后将出现大幅度增长 ,且在推进前期沉降增幅最为显著的结论 .给出了隧道周围土体塑性区的大小与分布 ,论证了要将地面沉降控制在允许范围内 ,必须在上、下行隧道施工中均进行预注浆加固 ,以重点控制盾构推进前期的地层沉降量 .最后 ,探讨了盾构刀盘推进力、一次推进步长。 Based on the suggested driving process of overlapped shield tunnel,a true thsee dimensional elasto plastic finite element analysis is taken into account in this paper.Results show that after the lower tunnel is first driven through,ground settlement and horizontal displacement in soil strata will produce a significant increment in the earlier period of excavating the upper tunnel and its value is approximately up to four times as much as before.So it is essential to take strengthening measure by grouting for nearly saturated and severely disturbed soft soil around the tunnel.Soil plastic zone is given for different sections along the designated route line.Some influence factors effected on ground settlement during the overlapped shield driving are also evaluated.
作者 孙钧 刘洪洲
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 2002年第4期379-385,共7页 Journal of Tongji University:Natural Science
关键词 交叠隧道 盾构法 施工 土体变形 三维数值模拟 overlapped tunnel shield driving three dimension finite elements analysis ground settlement influence factors
  • 相关文献

参考文献6

  • 1中国船舶工业勘察设计研究院.上海市明珠线二期工程南浦大桥站工程地质勘察报告[M].上海:中国船舶工业勘察设计研究院,2001..
  • 2孙钧.质构隧道施工的土体扰动及其环境稳定与控制.1999海峡两岸都市公共工程学术暨实务研讨会论文集[M].上海:上海市土木工程学会,1999.314-333.
  • 3易宏伟.盾构施工对土体扰动与土层移动影响的研究[M].上海:同济大学,1999..
  • 4徐方京.软土隧道与深开挖引起土体孔隙水压力与地层移动分析[M].上海:同济大学,1991..
  • 5刘洪洲.盾构施工对软土地层沉降影响综述[J].公路隧道,2001(3):5-10. 被引量:14
  • 6刘洪洲,孙钧.软土隧道盾构推进中地面沉降影响因素的数值法研究[J].现代隧道技术,2001,38(6):24-28. 被引量:52

二级参考文献5

共引文献64

同被引文献1238

引证文献191

二级引证文献1486

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部