摘要
结合铜绿山铜矿工程实例 ,建立了FuzzyTopsis模型 (向理想解接近的排序技术 ) ,并用于露天矿剥离与采矿工程进度编制的多目标模糊优选决策 ,实际应用表明该模型及算法可靠。
In this paper, in the light of concrete engineering conditions of Tong lu shan copper mine, a model of the fuzzy TOPSIS(technique for order prefernce by similarty to ideal solution) is established. This model has been applied in the fuzzy optimization decision making of multi objective of planning stripping and mining schedules for a open pit mine. It shows that these methods are effective in practical.
出处
《矿冶工程》
CAS
CSCD
北大核心
2002年第1期16-18,共3页
Mining and Metallurgical Engineering
基金
国家"九五"重点科技攻关项目 (95 1 1 6 0 3 0 1 0 2 )
关键词
多目标模糊决策
露天矿
采剥进度计划
优选
fuzzy TOPSIS
planning of stripping and mining schedule
open pit mines