摘要
白岩潭潮位站位于闽江下游感潮河段 ,其水流受到上游来水与口外潮汐的共同作用 .文中探讨了洪水期间白岩潭水位的数值计算法、相关分析法和组合概率法 ,对各自的长处与存在的问题进行了分析 .
Baiyantang tidal station is located atthe lower Minjiang River. The flow is controlled by tide and runoff together.There are mainly three methods which are numerical simulation,interre- lated analysis and combinatorial probability analyses have been used to study the water level at the Baiyantang station in the flood period. The advantages and shortages of the three methods have been introduced and commented in the paper.
出处
《福建师范大学学报(自然科学版)》
CAS
CSCD
2002年第2期89-93,共5页
Journal of Fujian Normal University:Natural Science Edition