摘要
“九五”期间,我国开展了对先进压水堆核电站关键技术的研究和攻关。研究的领域涉及到核电站的安全性、经济性、建造和运行等方面的内容,开设了工程设计技术、先进反应堆设计技术、数字化仪表与控制系统、非能动安全系统和核电站工程及信息管理技术等5个研究课题。在此期间,许多研究成果已经用于工程,收到很好效果。“九五”先进压水堆核电站关键技术研究对我国新一代压水堆核电机组的开发和科研打下了坚实基础。
In the period of 'ninth five-year plan', research and tackling key problems on the key technologies of advanced PWR nuclear power plant have been carried out. The investigative region is involved in the security, economy, building and operation of nuclear power plant. Five research subjects is established, there are engineering design technology, advanced reactor design technology, digitalization instrument and control system, passive safety system and nuclear power plant engineering, information management technology. In the meantime, many production have been used for engineering, and fine effectiveness are received. The research of 'nineth five-year' advance PWR nuclear power plant key technologies is the stability base for development of new generation PWR nuclear generator team and scientific research in our country.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2002年第A02期1-6,共6页
Nuclear Power Engineering