摘要
在黄石港 2、3号码头扩建工程中 ,对码头配电系统、控制系统及供电线系统进行全面优化。对港口供电变压器容量的确定 ,应综合考虑码头的特殊性因素 。
In the expanding engineering of No.2,3 whavfs, port Huangshi, the power constribution system, control system and the power supply system are wholely optimized. In ovder to determine the capicity of the transformer,the wharf's specific factors must be considered complexly. It isn't practicable to search of high coefficient of efficiency such like continuous productive factory
出处
《港口装卸》
2001年第6期16-18,共3页
Port Operation