期刊文献+

宁波北仑电厂二期循环水泵房基坑支护与监测 被引量:10

Supporting and monitoring deep excavation of the phase II pump-station of circulation water of Beilun in Ningbo
下载PDF
导出
摘要 介绍了宁波北仑电厂二期工程地下连续墙支护结构的计算与监测。采用ALGOR有限元分析系统,对基坑开挖引起的应力场、位移场进行了分析计算。对墙体变形、钢筋应力、土压力及沉降进行了观测。通过计算值与实测结果的比较,分析了影响基坑变形的主要因素。 The retaining structures of diaphragm wall of the phrase II project of Beilun power station in Ningbo was calculated and monitored.By using ALGOR finite element analysis system,the stress field and displacement field of deep excavation were calculated.The paper gave some measured results including deformation of wall,steel stress,soil pressure and the settlement.Through comparison of calculation results and measured data,some main factors that affect the deformation of foundation pit were analyzed.
出处 《岩土力学》 EI CAS CSCD 北大核心 2002年第1期120-123,共4页 Rock and Soil Mechanics
关键词 电厂 循环水泵心 深基坑 有限元 支护结构 监测数据 deep foundation pit FEM retaining structures monitoring results
  • 相关文献

参考文献3

二级参考文献4

  • 1匿名著者,1995年
  • 2陈希哲,地基事故与预防,1994年
  • 3团体著者,岩土工程手册,1994年
  • 4《基坑工程手册》编辑委员会[编],刘建航,侯学渊.基坑工程手册[M]中国建筑工业出版社,1997.

共引文献48

同被引文献45

引证文献10

二级引证文献179

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部