摘要
提出通过计算各工序优先系数的方法进行资源限定,实现最短工期优化,使该类型的优化从定性优化变成了定量优化,为该类型的优化提供了一个新的求解思路。
This paper puts forward an optimum me thod by computing the priority coefficient of each working procedure to limit resources and imp lement the optimization of the shortest time limit for a project.The opti-mum method enables this type of optim ization to change the qualitative op timization into the quantitative on e and provides a new way for it.
出处
《济南交通高等专科学校学报》
2002年第1期24-25,37,共3页
Journal of Jinan Communications College
关键词
最短工期
优先系数
施工计划
定性优化
定量优化
the shortest time limit for a project
priority coefficient
construction