编组站布局规划模型 被引量:18

An optimization approach to railroad classification yard location and installment size decision with budget constraint
下载PDF
导出
摘要 研究路网上新建编组站的合理位置选择和既有编组站技术改造项目选择的综合优化问题。通过设计两组 0 - 1决策变量 ,构造了该问题的多项目决策数学规划模型。其目标函数是最小化项目投资和车流改编、集结费用。由于可能的编组站投资方案是一个很大的比选数目 ,每一种投资方案组合又要计算相对应的车流组织费用 ,故该模型的复杂度很高。 This paper describes a multi project decision model to determine the location and size of some new classification yard or planning for the prospective technical profile of some existing yard with budget constraint. The objective function is to minimize the total costs of investment and routing the given traffic flow when different reclassification operating and frequency delay assumptions are made about the location of the new yards or renew some yards. Since a large set of possible locations and sizes of yards may result in considerable computation, some constraints of relative investment are add to the model to decrease the number of patterns of combinatorial investment.
出处 《铁道学报》 EI CAS CSCD 北大核心 2002年第3期5-8,共4页 Journal of the China Railway Society
关键词 布局规划模型 编组站 投资 定位 整数规划 综合优化 设计 railroad classification yard(marshalling station) location investment integer programming
  • 相关文献

参考文献4

二级参考文献10

共引文献15

同被引文献104

引证文献18

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部