摘要
以新余给水所的脉冲澄清池加装斜管为例 ,论述加装斜管对提高水质的效果 ,以及增大设计流量的可能性 .并针对加装斜管后所出现的不易排泥问题 ,提出相应的解决办法 .
Taking the example of reconstruction of the pulse clarifier of Xinyu Water Supply Station, the possibilities of improving the water quality and increasing the designing runoff are discussed in this paper, and also the relevant solutions about the problem of earth clearance are come up with.
出处
《华东交通大学学报》
2002年第2期68-71,共4页
Journal of East China Jiaotong University