摘要
为了解决华南橡胶轮胎有限公司原来多条10kV供电系统较混乱的局面,决定兴建110kV输变电站,一次电路按常规无人值班方式设计,二次电路采用全新综合自动化系统,取消了传统方式中如信号屏、控制屏等设备,增加了很多自动控制功能。实践证明此项设计方案造价低、设备可靠性高,提高了供电质量。
introduces setting up a 110kV transmission power station, once circuit line design was according to the normal design without operator on duty, secondary circuit line design adopted all new comprehensive automation system. This system cancelled the traditional equipment for instance signal screen, control screen and so on. Added lots auto control functions. By factor proved the design solution was lower cost and reliable equipment. It increased the quality of power supply.
出处
《橡塑技术与装备》
CAS
2002年第6期54-56,共3页
China Rubber/Plastics Technology and Equipment
关键词
110KV输变电站
综合自动化系统
开关柜
断路器
保护装置
监控
网络
kV transmission power station
comprehensive automation
switch pannel
breaker
protection device
monitor
network (XS-02)