摘要
通过对高强钢焊接性能的分析 ,提出了高强钢冬季焊接施工带来的问题及处理办法。
By means of analysis on welding prformance for high strength steel,the problems caused by welding construction in winter and solutions are presented The reliable welding preheating and post welding insulstion are the key measures to ensure the quality of welding construction in winter
出处
《石油化工设备技术》
CAS
2002年第2期46-49,59,共5页
Petrochemical Equipment Technology