台湾海峡隧道工程的若干工程地质问题与选线方案探讨 被引量:4

ENGINEERING GEOLOGICAL PROBLEMS OF THE TAIWAN STRAIT TUNNEL PROJECT AND PRELIMINARY STUDY ON THE ROUTE PLAN
下载PDF
导出
摘要 对台湾海峡的地质状况了进行了分析 ,作者认为 ,台湾海峡的工程地质条件复杂 ,地震、活动断裂、岩土体稳定性、海底底床活动性等是隧道工程将遇到的主要工程地质问题。隧道的线路选择应进行全面、深入的技术、经济比较。 Engineering geological conditions are rather complicated in the Taiwan Strait. The major engineering geological problems to be encountered by the proposed Taiwan Strait Tunnel (TST) Project are earthquakes, actives faults, stability of rock and soil masses, bedform activities, etc., and those problems are studied here preliminarily. Tunnel route selection should be carried out based upon comprehensive technical and financial analysises. Two routes are proposed and discussed: One is from Pingtan to Hsinchu, and the other is from Xiamen to Jiayi through Kingmen and Penghu Islands.
出处 《海洋科学》 CAS CSCD 北大核心 2002年第6期58-63,共6页 Marine Sciences
关键词 台湾海峡 隧道工程 工程地质问题 选线方案 Taiwan Strait, Tunnel, Engineering Geology, Earthquakes, Active Faults
  • 相关文献

参考文献9

二级参考文献12

  • 1Sun Sichih,Energy,1985年,10卷,3/4期
  • 2Liu C H,Ged Soc Malaysia Bulletin,1985年,18期
  • 3程裕淇,福建省区域地质志,1985年
  • 4Chai H T,Science,1972年,5期
  • 5Teng L S,Tectonophysics,1990年,183卷
  • 6黄慈流,台湾海峡西部石油地质地球物理调查研究,1989年
  • 7Teng L S,Sci Reports Nationa Tawan Univ,1987年,25期
  • 8水涛,徐步台,梁如华,邱郁双.绍兴-江山古陆对接带[J]科学通报,1986(06).
  • 9彭阜南,眭良仁,梁居廷,沈华悌.关于东海晚更新世最低海平面的论据[J]中国科学(B辑 化学 生物学 农学 医学 地学),1984(06).
  • 10徐步台,水涛.浙江绍兴-江山断裂带混合岩及其两侧基底变质岩的同位素年龄测定[J]科学通报,1983(24).

共引文献56

同被引文献31

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部