摘要
针对柳林电厂灰场混凝土排水管破裂的处理情况 ,详细介绍了采用现浇钢筋混凝土排水管加固时 ,如何进行顺序划分、异形模板制、安等特殊过程 ;采用预制钢筋混凝土管进行加固时 ,如何利用高强膨胀水泥进行填充。为在复杂及困难条件下的管道加固提供了宝贵的经验。
According to the treatment situation of fractured reinforced concrete drainpipe in Liulin power plant the detailed construction technology adopting cast in place reinforced concrete to reinforce drainpipe is introduced in detail, which contain division of procedure and the fabrication and installation of shaped moulds. The technology of filling by high strength expanded cement in the reinforcement process adopting cast in place reinforced concrete is introduced. This paper brings valuable experiences for pipeline reinforcement under complicated and difficult conditions.
出处
《山西建筑》
2002年第6期80-81,共2页
Shanxi Architecture
关键词
钢筋混凝土
排水管
破裂
加固
压力灌浆
reinforced concrete pipe, fracture, reinforcement, pressure casting