期刊文献+

高层住宅楼室内装修与各工种的配合施工管理

Indoor decoration of high-rise residential buildings and coordinating construction management of various workers
下载PDF
导出
摘要 随着室内装修标准档次的提高 ,各专业功能设施、配套设施更加完善 ,而两者的施工顺序、施工工艺的相互配合、协调问题就显得更加突出。明确了室内装修的主要内容和与其配合施工的各专业施工的主要项目。分析了诸多影响工程工期和工程质量的关键环节 ,采用立体交叉配合作业的方法 ,安排好各专业工种插入配合的时间 ,以达到按质如期完工的目的。 With the enhancing of indoor decorative standards and the functional facilities the coordination of construction technologies is very important for construction. In this paper the main content of indoor decoration and the main items of coordinating construction are made clear. The key points influencing the engineering quality and limit time are analyzed. Adopting fly over crossing coordinating method and scheduling the coordinating time of various professional workers the engineering can be completed in limit time with high quality.
作者 韩玉琴
出处 《山西建筑》 2002年第6期116-117,共2页 Shanxi Architecture
关键词 高层住宅 施工管理 室内装修 立体交叉 配合作业 indoor decoration, professional workers, fly over crossing, coordinating operation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部