摘要
石横特殊钢厂康斯迪电炉工程中液压设备应用了近年新兴的液压技术,与该厂原有液压设备设计相比,节约设备投资66万元,每年降低设备运行费用及维修费用30万元。
The new hydraulic technology developed in recent years have been used in the Consteel-EAF project erected newly in Shiheng Special Steel Plant. Compared to the former hydraulic technology design in this plant, the new technology can save the equipment investment by 660 thousand yuan RMB, and can decrease the operation and maintenance costs by 300 thousand yuan RMB every year.
出处
《连铸》
2002年第2期25-26,32,共3页
Continuous Casting