摘要
东莞国际会展中心最大的钢管主桁架采用工厂散件制作 ,现场分段拼装 ,高空原位四机抬吊就位的施工方法 ,并采取一系列措施保证了施工质量。
During construction of largest main steel pipe trusses of Dongguan International Meeting and Exhibition Center, engineers adopted many construction methods such as components made in factory, on\|site segmented assembly, and lifting and installation in\|air at original places with four tower cranes. A series of measures were taken to ensure construction quality.