摘要
对入世带来的机遇和挑战,襄樊正发桩基工程有限责任公司推行施工项目管理,加强进度、质量、费用的控制,合同、信息的管理以及组织的协调,优化配置现有资源,建立质量安全保证体系,走出企业低谷。
Facing the opportunity and challenge after entering the WTO, the Zhengfa Pile Foundation Engi- neering Co. Ltd in Xiangfan carries out project management in construction and strengthens the control of pro- cess, quality and expenses. The contracts and information have been put into order and the branches and depart- ments coordinate and is in good harmony. In addition, a quality and safety guaranty system has been set up. All these help the Zhengfa company departs the slow down period and develop healthily again.
出处
《湖北地矿》
2002年第1期48-49,47,共3页
Hubei Geology & Mineral Resources