期刊文献+

马垱堤、杨柳船行堤加固处理

The Strengthening of Dike of Madang and Yangliuchuanxing
下载PDF
导出
摘要 根据马堤、杨柳船行堤现存的工程主要问题 :堤身单薄矮小 ,堤身堤基渗漏、脱坡 ,江岸崩塌严重 ,抗冲刷能力低 ,建筑物破损漏水等 ,经过抗滑稳定和渗流稳定计算 ,提出了确实可行的加固处理方案 :堤身加宽加高 ,浆砌石护坡 ,江岸抛石固脚 ,干砌石护岸 ,填塘压浸 ,建筑物加固处理等 .使堤防标准得以提高 ,江堤防洪能力增强 . According to the engineering main problem of dike of Madang and Yangliuchuanxing at present,such as dike being thin and short,its body and basis leaking and falling off,bank falling severely,running low power to resist scour,building in disrepair and leaking etc.By calculating stabilization of resisting glide and seep,we brought forward a strengthening plan,for example,making dike wider and higher,protecting incline with bondstone,revetting bank with bondstone,filling pond,building pin up. Thus dike is advanced to a higher standard to prevent flood.
出处 《南昌大学学报(工科版)》 CAS 2002年第1期90-92,96,共4页 Journal of Nanchang University(Engineering & Technology)
关键词 加固处理 马Dang堤 杨柳船行堤 堤防处理 防洪能力 Madang dike Yangliuchuanxing dike dike strengthening prevent flood
  • 相关文献

参考文献1

  • 1-.土坝设计[M].北京:水利电力出版社,1978..

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部