摘要
对于系统建模体系不完善导致MIS开发过程中出现的系统划分不科学、系统间关系不清晰及系统功能不明确等问题进行了分析。为了充分发挥系统建模在系统开发过程中的重要作用 ,引入了一种面向对象的图形化建模语言 (UML) ,利用UML进行电厂MIS系统的建模设计。最后 ,通过实例 ,证明了用UML进行电厂MIS系统设计的实用性和有效性。
The problems occurred during the development of power plant MIS (Management Information System) are analyzed.They are unscientific system division,unclear relationship between subsystems,uncertainty of system function and so on,which are caused by the imperfection of system modeling architecture.In order to bring the system modeling into an important play in system development,UML (Unified Modeling Language)is introduced to the modeling design of power plant MIS,which is object-oriented and visualized.An example shows its practicability and effectivity.
出处
《电力自动化设备》
EI
CSCD
北大核心
2002年第7期50-52,共3页
Electric Power Automation Equipment