考虑非凸曲线的电力市场交易计划方法 被引量:2

APPLICATION OF QUADRATIC PROGRAMMING METHOD FOR COMPETITIVE PRICE IN ELECTRICITY MARKET
下载PDF
导出
摘要 文中以二次规划算法解决了电力市场环境下考虑爬坡约束的短期发电计划的制定问题。该方法的主要思想是将每台机组的报价曲线处理成一报价区域,从而将优化问题变成标准的二次规划形式,进而运用二次规划算法求解。这种方法还可以解决任意形状报价曲线给交易算法带来的困难。用一简单系统的实际计算验证了该方法的有效性。 The quadratic programming method is used to solve the short-term power generation scheduling problem under the condition of electricity market and considering the ramp constraints of generating sets. The main idea of this method is to deal with the bidding curve of each generating set to a bidding area. Therefore, the optimization problem can be changed to normal quadratic programming form which can be solved by quadratic programming method. This method can be also applied to solve the difficulty in transaction algorithm caused by bidding curve with arbitrary shape. The effectiveness of this method is proved by the results of calculation example for a simple testing system.
出处 《电网技术》 EI CSCD 北大核心 2002年第7期19-23,共5页 Power System Technology
关键词 非凸曲线 电力市场 交易计划方法 电力行业 电力系统 二次规划 quadric programming electricity market generation scheduling
  • 相关文献

参考文献5

  • 1[1]Shangyou H,George A A,Harry S et al.Consumer payment minimization in power pool auctions[J].IEEE Trasactions on Power Systems,1998,13(3):986-991.
  • 2[2]Ferrero R W,Shahidehpour S M,Ramesh V C.Transaction analysis in deregulated power systems using game theory[J].IEEE Transactions on Power Systems,1997,12(3):1340-1348.
  • 3[3]Einar H S,Iwar W,Hans H F.Thermal power generation scheduling by simulated competition[J].IEEE Transactions on Power Sy-tems.1999,14(2):472-477.
  • 4王承民,郭志忠,于尔铿.电力市场中一种基于动态规划法的经济负荷分配算法[J].电力系统自动化,2000,24(21):19-22. 被引量:24
  • 5于尔铿,周京阳,吴玉生,王功涛.发电竞价算法(二)——等报价法[J].电力系统自动化,2001,25(5):10-13. 被引量:26

二级参考文献7

共引文献47

同被引文献17

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部