摘要
运用“提示序列”方法可以建立了多种高炉铁水含硅量一步预测模型 ,通过用鼓风动能和风量、风温两种方法对预测模型的预测值进行修正 ,查使命中率提高 4 -
Many first step predicting models were built using 'Leading indictor'in this paper.Predictors were modified using two parameters:Ventilation,hot air volume and temperature which can increase hitting ratio for 4-5%.
出处
《太原教育学院学报》
2002年第B06期45-49,共5页
Journal of Taiyuan Institute of Education
关键词
高炉
提示序列
预测模型
铁水
含量
风量
时间序列
Leading indictor
predicting hot metal silicon content
predicting model
U-C method