摘要
介绍广州珠江发电厂 1号机组 DCS一体化改造后 ,制粉系统跳闸回路的控制策略、试验及相关回路修改情况。控制回路完善后 。
After the integral DCS modification of No.1 generator set in Zhujiang power plant,the control tactics of trip circuit for pulverizing system,test and the improvement of related circuit were introduced.After the completion of control circuit,the processing capability of generator set for trip mode of coal pulvrizing system was upgraded significantly.
出处
《湖北电力》
2002年第3期11-12,共2页
Hubei Electric Power