期刊文献+

初始管柱压缩量计算分析——封隔器管柱受力分析系统讨论之三 被引量:9

CALCULATION ANALYSIS OF INITIAL AMOUNT OF COMPRESSION OF TEST STRING --The Third Discussion of Force Analsis System of Packer String
下载PDF
导出
摘要 初始油管压缩量计算 ,是某些封隔器管柱受力分析计算的重要参数 ,它不仅能够对封隔器坐封时现场施工提供指导 ,而且还是后续施工或完井过程中计算管柱的受力和变形的基础。文中对初始管柱压缩量计算公式进行了推导和分析 ,并给出了算例。现场应用表明 。 Calculation of initial amount of compression of tubing is an important parameter for calculation analysis of one packer string force.It not only supplies instruction for field construction while packer is being packed,but also is basis of calculating force and determining string deformation during the later operation process or well completion.Calculation equation of initial amount of compression of string is deduced and analysed,and calculation examples are given in the paper.
出处 《钻采工艺》 CAS 2001年第6期48-51,54,共5页 Drilling & Production Technology
关键词 初始管柱 压缩量 计算 封隔器 管柱受力分析系统 pipe string,initial,amount of compression,computational analysis
  • 相关文献

参考文献3

二级参考文献3

共引文献15

同被引文献46

引证文献9

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部