摘要
本文介绍了二滩水电站河床截流方法研究、截流模型试验成果和二滩水电站河床截流施工的全过程。
Scope of this paper is river closure at Ertan hydroelectric power station of the Yalong River in Sichuan Province,including primary studies of river closure method and the main experimental results of model tests and execution of river closure.
出处
《水力发电学报》
EI
CSCD
北大核心
2002年第2期44-56,共13页
Journal of Hydroelectric Engineering
关键词
二滩水电站
河床截流
平堵
立堵
Ertan hydroelectric power station
River closure
Transverse dumping
End dumping