摘要
通过划分沿线地质地貌单元,完成了布点、坑探、描述、取样、试验及数据收集统计等工作,分析了各单元土体的土质成因类型及性状,划分出沿线的膨胀土和不良土质路段,并提出处理意见。
By dividing the geological and physiognomic units along the project highway, the work related to spotting, pit detecting, describing, sampling, testing and data collecting was completed, the type of soil cause and shape for each unit were analyzed, the sections of expansive soil and bad soil were marked off, and finally the recommendation on treatment was brought forward.
出处
《广西交通科技》
2002年第1期53-58,61,共7页
Guangxi Communication Science & Technology