三峡施工期葛洲坝通航水位工程措施研究 被引量:2

On Construction Measures for Navigable Depth of Gezhouba Dam During Construction of the Three-Gorges Project
下载PDF
导出
摘要 通过葛洲坝下游宜昌河段的水文资料分析 ,提出了三峡工程施工期间 ,葛洲坝三江航道将面临断航的威胁 ;在定床实体模型上 ,进行了整治工程方案试验研究 。 From the analysis of hydrolic data of Yichang Reach at downstrean water of Gezhouba Dam,it's consi dered that navigation in Sanjiang Channel will be influenced during the constrution of the three Gorge project.Therefore,test study on the regulation scheme is performed on the fixed bed model and the problem of navigable depth during the construction of the Three Gorge Project will be basically solved by the regulation scheme proposed in the paper.
出处 《水道港口》 2002年第2期66-72,共7页 Journal of Waterway and Harbor
基金 "九五"长江三峡工程泥沙问题研究 (95 - 1 - 1 )
关键词 施工期 通航水位 葛洲坝三江航道 整治工程 定床实体模型 三峡工程 试验研究 Sanjiang Channel of Gezhouba Dam regulation measures fixed bed model
  • 相关文献

参考文献4

  • 1赵连白 袁美琦 等.三峡建坝后宜昌河段及上荆江重点港口河段变化规律及治理措施初步研究.长江三峡工程泥沙和航运问题研究成果汇编(II)[M].北京:交通部三峡办公室,1997.962-986.
  • 2赵连白 袁美琦.葛州坝下游水位下降对三江下引航道影响及治理措施初步研究.长江三峡工程泥沙和航运问题研究成果汇编(II)[M].北京:交通部三峡办公室,1997.1007-1016.
  • 3赵连白 袁美琦 等.潜坝水力学特性试验.内河航道整治工程技术交流大会论文集[M].北京:人民交通出版社,1998.678-683.
  • 4黄悦 黄煜龄.宜昌至大通河段中淤一维数模计算[M].武汉:长江水利委员会长江科学院,1997..

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部