摘要
针对山西阳光发电有限责任公司 1号发电机反时限过激磁保护一直未投入的现状 。
According to practical Situation in Yangquang electric power generation Company,On the base of the analysis,Gives a plan to put the generator scheme inverse-time-limit over-excitation protection into practise.
出处
《山西电力》
2002年第3期30-31,共2页
Shanxi Electric Power
关键词
发电机
过激磁保护
定值整定
over-excitation
inverse-time-limit
scheme proof