3[6]Willberg D M,Sternsberger N.Optimization of fracture clean up flowback analysis[C].SPE 39920,1998.
4[7]Robinson B M,Holditch S A,Whitehead W S.Minimizing damage to a propped fractureby controlled flowback procedure[J].JPT,1988,40(6):753-759.
5[9]Ely J W,Arnold W T,Holditch S A,et al.New techniques and quality control find successin enhancing productivity and minimizing proppant flowback[C].SPE 20708,1990.
6[11]Barree R D,Mukherjee H.Engineering criteria for fracture flowback procedures[C].SPE 29600,1995.
7[13]Anderson A J,Ashton P J N,Lang J.Production enhancement throught aggression flowback procedures in the codell fomation[C].SPE 36468,1996.