摘要
该文在总结和分析了我国现有软弱地基的处理措施的基础上 ,针对新建内昆铁路老锅厂—李子沟段复杂的软基情况 ,结合复合地基的载荷试验结果以及现场的观测 。
On the basis of summarizing and analyzing the existing treatment measures for the soft foundation of railroad in China, combining with the result of the load test for composite foundation and the observations obtained on site, a comprehensive treatment measure for the complex soft foundation at the Laoguochang-Liziguo section of new built Neikun railroad is put forward in the paper
出处
《勘察科学技术》
2002年第3期13-16,共4页
Site Investigation Science and Technology
基金
国家自然科学基金资助项目 (4 0 0 74 0 0 3)
中科院知识创新工程项目 (KZCX2 - 1 0 6 )