摘要
邯钢薄板坯连铸连轧工程投产初期水处理事故多,本文对该系统存在的问题进行了探讨分析,并针对存在问题采取了相关措施和对策。
Being just put into operation, there were so many breakdowns in the water-treating system of sheet billetcon-casting and con-rolling project. The problems in the system were discussed and analyzed and some corresponding measures adopted.
出处
《河北冶金》
2002年第2期44-45,58,共3页
Hebei Metallurgy
关键词
薄板坯连铸连轧
水处理系统
设备故障
sheet billet con-casting and con-rolling
water treatment
equipment breakdown