摘要
采用波动方程法进行打桩过程的模拟计算 ,对桩锤和打桩系统各部件进行选择 ,以便提早发现问题 ,避免影响现场工作。通过对几个工程实例的研究表明 ,这种分析方法有较好的适用性。
Analog computations were made to simulate the process of pile driving with the wave equation method to select pile driving hammers and components of a pile driving system in order to discover any possible problems in advance to avoid adverse influence on pile driving operations on site. Studies on several engineering cases show that the method has a very good adaptability
出处
《中国港湾建设》
北大核心
2002年第3期33-36,共4页
China Harbour Engineering