摘要
介绍了大型电站锅炉安装过程中监装工作的重要性和实施方法 ,并着重介绍吴泾第二发电厂2 0 0 8t/h锅炉三大部件监装实施情况和取得的成绩。
This paper describes the importance and method of supervising the boiler installation in large power plant, and specially introduces the experience of supervising the installatin about three large parts of 2008t/h boiler in Wujing second power plant. It is valuable and can be referenced for contorlling quality in installing large boiler in future.
出处
《锅炉技术》
北大核心
2002年第6期28-32,共5页
Boiler Technology
关键词
吴泾第二发电厂
2008t/h控制循环锅炉
监装
效果
Wujing second power plant
2008t/h controlled circulation boiler
supervise the installation
effect