摘要
对吸收塔填料堵塞的原因从理论和生产实际两方面进行分析 。
An analysis is made of the causes for block up of packings in the absorption tower from theory and production practice, and measures for decrease in block up and the handling method after block up are given.
出处
《化肥工业》
CAS
2002年第3期52-53,62,共3页
Chemical Fertilizer Industry