摘要
本文在研究了深基坑降水三维有限元计算程序设计方法的基础上 ,应用该法对武汉市中山广场地下过街道降水工程进行了计算 ,分析结果可知 。
Based on studying method deep foundation pits dewatering program designing method of three dimensional finite element (3D FEM),the author analyzes a practical example the dewatering of the passage under the ground from Zhongshan Public Square to Wuhan Exhibition Center.The result shows the method is suitable for the calculation of deep well dewatering.
出处
《土工基础》
2002年第2期2-6,共5页
Soil Engineering and Foundation