期刊文献+

钱塘江河口海塘工程土工袋吹填土围堰与施工 被引量:2

Cofferdam Constructions with Geomaterial Bags and Dredger Fill Method in Sea-bank Projects at Qiantang River Estuary
下载PDF
导出
摘要 通过对钱塘江强涌潮地段施工围堰所采用的结构形式、布置、施工方法、经济指标、维护加固等的阐述 ,证明围堰施工是可行的 ,这对标准海塘工程建设进度、质量、安全更有保障 。 In this article,the structural form,layout,construction method,economic index,maintenance and reinforcement of the cofferdam constructionat the rough-swell tide sections of the Qiantang River is expounded in detail.The feasibility of building cofferdams at these unusual sections used to be doubted by many experts,but now the successful facts in cofferdam construction eliminate all doubts on it.The construction schedule,engineering quality and safety of standard sea bank projects can be guaranteed than before,which proves the technology is worth popularizing.
出处 《浙江水利水电专科学校学报》 2002年第2期27-29,共3页 Journal of Zhejiang Water Conservancy and Hydropower College
关键词 钱塘江河口 海塘工程 土工袋 吹填土 围堰 施工 rough swell tide cofferdam construction
  • 相关文献

参考文献1

  • 1GB 50201-1994.防洪标准[S],1994.

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部