摘要
曹娥江五甲渡裁弯工程是曹娥江中、下游的主要防洪工程之一 .在河道裁弯后的通水运行几年中 ,新河行洪效果良好 ,防洪效益明显 ,正负效应与预计的基本一致 .
Cutting off the project on Wujia Ferry is one of the major projects on middle and lower reachs of Cao'e River.In the years' operation after the project finished,the effects of leading the flood and the benefit of preventing the flood is obvious.The positive and negative benefits are basically identical to what expected.
出处
《浙江水利水电专科学校学报》
2002年第2期32-33,共2页
Journal of Zhejiang Water Conservancy and Hydropower College
关键词
曹娥江五甲渡
潮汐河口
裁变
正负效应
tidal estuary
cuting-off of rivers
positives and negatives