摘要
依据黄土压缩湿陷试验结果 ,按建筑物对象不同分两种情况对东雷抽黄二期工程桦木寨子段黄土地基进行了湿陷性评价 ,并建议了符合实际的黄土地基湿陷等级。
According to test of loess compression and collapse, the collapsibility of loess foundation is evaluated under two conditions according to the different construction in second phase engineering of pumping water from Yellow river in Donglei, and the collapse grade of loess foundation is suggested, which accords with the real case.
出处
《西北水资源与水工程》
2002年第2期9-13,共5页
Northwest Water Resources & Water Engineering