摘要
文章论述了沧州等地变电站设计过程中所遇到的软土地基处理施工方案 ,对软基加固方法进行综合评价 ,并提出了适合该区域软基处理的最佳方案 ,从而达到优化设计、保证建筑结构的安全可靠、减小工程投资的目的。
There encountered the treatment and construction schemes of soft clay foundation in the design of Cangzhou substation.The stoutening method for the foundation is comprehensively assessed,and has proposed optimal scheme to treat the soft foundation suitable for the district,so as to obtain an optimal design,ensure security and reliability of the construction structure and diminish the investment used in the engineering.
出处
《河北电力技术》
2002年第3期41-43,共3页
Hebei Electric Power